Tuesday, September 13, 2016

Empennage

Empennage Fairing  ( 1 hr )

Sanded both sides of attached Vert Stab Tip, and both LH & RH Elevator top sides.   They need a second pass of epoxy filler to be done.

No comments:

Post a Comment