Friday, December 30, 2016

Wings

Aileron Actuation ( 4 hrs )

Used Template and Center Punch to designate 6 holes at ends of each tube.  Included VA-111 Threaded Rod End in place (4x) so would be drilled simultaneously.  Drilled #40 followed by #30 using clecos to hold positions.  Deburred, cleaned with acetone, and primed.   Taped over alignment marks to enable correct re-assembly.   Plan touch up at those small areas with primer after riveting.
Used rod end bearing as "handles" to install rod ends.

 

Ready to rivet, then touch up label zones.

No comments:

Post a Comment