Tuesday, September 13, 2016

Empennage

Empennage Fairing  ( 1 hr )

Sanded both sides of attached Vert Stab Tip, and both LH & RH Elevator top sides.   They need a second pass of epoxy filler to be done.

Empennage

Empennage Fairings ( 2 hrs )

Monday, Sept 12

Attached  Vert Stab Tip after dimpling aluminum and Countersinking fiberglass.  Mixed 410 Microlight into epoxy, then applied to same VS Tip,  plus LH and RH Elevator Tips on top side now. First sanded surfaces with 400 grit followed by good cleaning with isopropyl alcohol.   (note:  this time slightly too much microlight mixed in  ...seemed a little harder to apply smoothly via squeegee.  I'll try a little less for second pass to fill in remaining rough spots after sanding)
after rivets, before applying filler
filler applied.  cure time more than 12 hours
one of 2 Elevator tips...top sides now