Aft Pushrod, Wiring Channel, Cable Links to Rudder, Bearing Bracket Stops ( 3 hrs )
Wrapping up several steps from various sections that are best done now prior to re-orienting Fuse to upright position. Installed Cable Links to Rudder Pedals at Sect 33-12. Ground Bearing Bracket stops at Control Bases per steps 1-2 at Sect 36-13. (top ones were "easy" to reach, but bottom was very challenging. Used mirror to position small file). Now forward and aft stick movements have contact with stops on both LH and RH sides simultaneously. Installed Aft Elevator Pushrod to Bellcrank Ass'ly per Sect 36-15. Riveted in Wiring Channel Ass'ly at front center under dash per Sect 35-10.
No comments:
Post a Comment