Monday, July 3, 2017

Fuselage

Drilling Rollbar Frames ( 4 hrs )

Pre-assembled Outboard & Inboard Straps to Fwd and Aft Rollbar Frame Assemblies per Sect 37-03 Steps 1-6.  Lots of #40 size clecos.   Delayed priming Straps and Window Shims until after drilling and C'sinking.  Lot's of #30 drilling (every #40 hole).  Not enough #30 clecos for every hole, but not required.
Outboard and Inboard Straps cleco'd to Fwd Frame

Aft Frame cleco'd

Window Straps cleco'd to Aft Frame

Drilling #30 holes, replacing #40 clecos.   1/4 remain to do...


No comments:

Post a Comment