Friday, April 13, 2018

Firewall Forward Kit

Completion of Alt Air Inlet/Door, and Air Ramps  ( 4 hrs )

Completed Alt Air Inlet and Door per Steps 7-16, Sect 47-20.  Epoxy/flox set up well.   Seems unnecessary to also rivet, but really secure now.   Installed onto Engine, then proceeded to Steps 1-10 at Sect 47-21 bending Right Air Ramp Cone, and Steps 1-8, 47-22 for Air Filter Cover w/ integral Air Ramp Cone.   Instructions and templates made these steps easy.   I substituted double sided tape for the spray on adhesive.
"tah dah ! "


Right Air Ramp Cone fits well.
2/3 done step forming Cover Air Ramp


Pleased with fit.

No comments:

Post a Comment