Monday, June 25, 2018

Firewall Forward Kit

Inlet Baffles ( 3 hrs )

Completed sanding Bottom Cowl inlets after test fit to Fuselage and Baffles (and another iteration for final tweaks).  Assembled Top to Bottom per Step 3 at Sect 47-27 to compare offsets.  Applied epoxy/cotton flox mix to Top Cowl outboard Inlets per Steps 4-9 ( 6mm & 10mm offsets).  Drilled & Mach C'sunk 8 holes in Bottom Cowl to mount Inlet Baffles per Steps 4-6 at 47-28.
LH Bottom Cowl Inlet shaping

RH Bottom Cowl Inlet shaping

Bottom contoured, now Top needs to be re-shaped

10mm offset on RH Side
6mm offset on LH Side



Top Cowl epoxy/cotton flox mix added

Needed to improvise to Mach C'sink inner and outer locations.

ready to mount Inlet Baffles

No comments:

Post a Comment