Monday, October 22, 2018

Firewall Forward

Control Cable installation ( 2 hrs )

Installed Throttle, Prop, and Mixture Control Cables, along with Alternate Air Cable per Step 5 and Fig 2 at Sect 50-02.  Since I revised location to bottom of Instrument Panel ( vs hung underneath) to provide greater knee clearance and visibility to Circuit Breakers, I'm pleased routing and clearances worked well.  The special doubler plate providing uniform surface on backside of IP for the nuts was a perfect fit ( links to Jan 17  and Jan 18, 2018 logs showing details). Thanks Stein Air!
Partially assembled...doubler plate in place

Prop Control Cable routed
all four installed !   working great, too.



view with all four installed.  Not fully tightened...yet.

bottom view:  pending tightening adel cushion
 clamps on each side, and addition of nylon ties
(may not be needed, but convenient plate above) 

No comments:

Post a Comment