Steevo's RV14a Build Log

Showing posts with label Empennage Attach. Show all posts
Showing posts with label Empennage Attach. Show all posts
Thursday, August 4, 2016

Empennage

›
Empennage Attach ( 1 hr ) Attached LH and RH Elevators to H.S, and re-measured full Up and full Down.   Some extra clearance needed at Aft...
Wednesday, August 3, 2016

Empennage

›
Empennage Attach ( 2 hrs ) Sect 11-07 & -08 mounted Vert Stab to Fuselage (temporary  - so delayed adding Ring Terminal to ground wire...
Tuesday, August 2, 2016

Empennage

›
Empennage Attach (4 hrs ) Drilled opposite Elev Horn using Drill Guide Block.  Checked T.E. alignment:  close but not perfect (I jigged wi...
Monday, August 1, 2016

Empennage

›
Empennage Attach (2  hrs) Sect 11-02 and -03 today...matched drilled #30 then step drilled to 1/4" LH, then RH Elevator Horns for Ste...
Sunday, July 31, 2016

Empennage

›
Empennage Attach ( 1 hr ) Back from 2 days at AirVenture (& 3 days in Door County).    Learned a few vital details from Van's crew...
Saturday, July 23, 2016

Empennage

›
Empennage Attach  (1.5 hrs) LH Elevator attached to rod end bearings (i.e. hinges).   When assembled, determined center rivets along spar ...
Friday, July 22, 2016

Empennage

›
Empennage Attach  ( 1 hr ) New Section 11, Empennage Attach started with installation of 4 rod bearings in Elevator ( 2 each LH and RH).  ...
›
Home
View web version

About Me

My photo
Steevo
Wickenburg, Arizona, United States
I'm building an RV-14A kit airplane purchased from Van's Aircraft. This website documents construction to show I've built in accordance with FAA's 51% rule. When finished it will be inspected by the FAA or designated representatives, and a special airworthiness certificate will be issued under the Experimental category.
View my complete profile
Powered by Blogger.