Steevo's RV14a Build Log

Thursday, April 7, 2016

Empennage

›
Elevators ( 2 hrs ) Sect 9-09, Setp 2 Attached (cleco'd) LH and RH Elevator Horns.   #30 (ie 1/8" holes) drilled at twelve times ...

Empennage

›
Elevator  ( 2.5 hrs )     April 6 , 2016 Cont'd Sect 9-08, Steps 2 & 3:  Cleco'd RH and LH Tip Assly's to Bottom Skins and...
Tuesday, April 5, 2016

Empennage

›
Elevator (0.5 hrs) Cont'd Sect 9-07:  Completed Steps 4-6 for Trim Tab Hinges - Drilled #40 holes, and trimmed ends flush.   Re-assemb...
Monday, April 4, 2016

Empennage

›
Elevator (4 hrs) Continued Sect 9-04 w/ Step 4 & 5.  Drilled 2 holes in end of Trim Tab Hinge while designating one Aft and other Fwd ...
Sunday, April 3, 2016

Empennage

›
Elevator (1.5 hrs) Sect 9-03, Step 3.  After removing vinyl at Close Out Tabs on Left Top & Left Bottom Skins, marked bend lines.  Th...
Saturday, April 2, 2016

Empennage

›
Elevator (4.5 hrs) Sect 9-2  Step 4:  Used hand seamer to adjust flanges to 90 deg on both E-904 Inboard Ribs and both E-903 Outboard Ribs...
Friday, April 1, 2016

Empennage

›
Elevator (1.5 hrs) Finished Page 9-2 Step 1 by deburring all edges...a LOT of edges for all 12 Ribs.  Time consuming, but good to get these...
‹
›
Home
View web version

About Me

My photo
Steevo
Wickenburg, Arizona, United States
I'm building an RV-14A kit airplane purchased from Van's Aircraft. This website documents construction to show I've built in accordance with FAA's 51% rule. When finished it will be inspected by the FAA or designated representatives, and a special airworthiness certificate will be issued under the Experimental category.
View my complete profile
Powered by Blogger.