Steevo's RV14a Build Log
Friday, September 16, 2016
Empennage
›
Empennage Fairing ( 1.5 hrs ) Sand...sand...sand. But "done" with Elevators and Vert Stab now. And previously Rudder was ...
Thursday, September 15, 2016
Empennage
›
Empennage Fairings ( 1 hr ) 2nd application of epoxy resin with 410 Microlight onto Vert Stab Tip (left and right sides), and top and bott...
Tuesday, September 13, 2016
Empennage
›
Empennage Fairing ( 1 hr ) Sanded both sides of attached Vert Stab Tip, and both LH & RH Elevator top sides. They need a second pas...
Empennage
›
Empennage Fairings ( 2 hrs ) Monday, Sept 12 Attached Vert Stab Tip after dimpling aluminum and Countersinking fiberglass. Mixed 410 M...
Saturday, September 10, 2016
Empennage
›
Empennage Fairings (2 hrs) Sand, sand sand... Rudder - Tip & Bottom (at strobe transition only), LH & RH Elev on bottom sides, ...
Friday, September 9, 2016
Empennage
›
Empennage Fairings ( 1 hr ) Added chamfer to inset of Vert Stab Tip Fairing. With left over epoxy resin, I smoothed in transitions from ...
Thursday, September 8, 2016
Empennage
›
Empennage Fairings (2 hrs ) Cut fiberglass patch that cured overnight, and trimmed to fit into Vert Stab Tip Fairing. I prefer to inset a...
‹
›