Steevo's RV14a Build Log
Wednesday, April 18, 2018
Firewall Forward Kit
›
Oil Cooler Tray, Breather tube, and Instrument Panel partially built ( 2 hrs ) Finished prep of Oil Cooler Tray, etc - but need warmer we...
1 comment:
Saturday, April 14, 2018
Firewall Forward Kit
›
Alt Air Inlet and Oil Cooler Tray ( 3 hrs ) Match drilled six #40 holes, dimpled the 2 forward locations, then riveted Right Air Ramp Cone...
Friday, April 13, 2018
Firewall Forward Kit
›
Completion of Alt Air Inlet/Door, and Air Ramps ( 4 hrs ) Completed Alt Air Inlet and Door per Steps 7-16, Sect 47-20. Epoxy/flox set up...
Thursday, April 12, 2018
Firewall Forward Kit
›
Alternate Air Inlet ( 2 hrs ) Continued prep for Alt Air Inlet Steps 7-16, Sect 47-19, then 47-20 Steps 1-5 to adhere with mix of epoxy/f...
Wednesday, April 11, 2018
Firewall Forward Kit
›
Alternate Air Inlet ( 2 hrs ) Completed Steps 6 & 7 at Sect 47-18. Started Alt Air Inlet at 47-19, Steps 1-8. Cut 3 1/2" hole ...
Tuesday, April 10, 2018
Forward Firewall Kit
›
Flox Snorkel to Air Filter Frame ( 2 hrs ) Completed trimming upper edge of Snorkel per Steps 4-12 at 47-12 and squeezed epoxy/flox mixtur...
Friday, April 6, 2018
Firewall Forward Kit
›
Snorkel Flange trimmed ( 2 hrs ) Completed Steps 9-18 in Sect 47-16, and Steps 1& 2 on next page. Trimmed Snorkel flange with templat...
‹
›
Home
View web version