Steevo's RV14a Build Log
Monday, April 23, 2018
Firewall Forward Kit
›
RTV sealant on Baffles. Oil Temp Sensor moved ( 3 hrs ) Applied Hi-Temp RTV at Engine to Baffle small gaps per Sect 47-24, Step 4. Va...
Saturday, April 21, 2018
Firewall Forward Kit
›
Oil Cooler, etc ( 2 hrs ) Riveted nutplates to Oil Cooler Tray and Supports (Steps 1-2 at Sect 49-08). Riveted Duct Flange to Oil Cooler ...
Thursday, April 19, 2018
Firewall Forward Kit
›
Breather Tube, Painted Oil Cooler Tray ( 3 hrs ) Installed Breather Tube per Steps 5-7 at 49-02. Reaching the two AN525-10R8 screws to ti...
Wednesday, April 18, 2018
Firewall Forward Kit
›
Oil Cooler Tray, Breather tube, and Instrument Panel partially built ( 2 hrs ) Finished prep of Oil Cooler Tray, etc - but need warmer we...
1 comment:
Saturday, April 14, 2018
Firewall Forward Kit
›
Alt Air Inlet and Oil Cooler Tray ( 3 hrs ) Match drilled six #40 holes, dimpled the 2 forward locations, then riveted Right Air Ramp Cone...
Friday, April 13, 2018
Firewall Forward Kit
›
Completion of Alt Air Inlet/Door, and Air Ramps ( 4 hrs ) Completed Alt Air Inlet and Door per Steps 7-16, Sect 47-20. Epoxy/flox set up...
Thursday, April 12, 2018
Firewall Forward Kit
›
Alternate Air Inlet ( 2 hrs ) Continued prep for Alt Air Inlet Steps 7-16, Sect 47-19, then 47-20 Steps 1-5 to adhere with mix of epoxy/f...
‹
›