Steevo's RV14a Build Log
Friday, December 14, 2018
Avionics
›
GAP 26 wiring ( 1 hr ) Tightened and torqued gnd bolt. Bundled wires along with alum tubing. Sent email with pics to G3Xexpert@garmin.co...
Thursday, December 13, 2018
Avionics
›
Gap 26 heated Pitot installed ( 3 hrs ) Trimmed 3/16" OD alum tubes to 8 1/4" on GAP 26 heated Pitot (Garmin instructions note ...
Wednesday, December 12, 2018
Avionics
›
Pitot Heater wire install & ADS-B Antenna ( 3 hrs ) Crimped open barrel male pin (ref Sect 5-21 for instructions) to red 14ga wire for...
Tuesday, December 11, 2018
Avionics
›
Pitot and AOA lines ( 2 hrs ) Routed blue 1/4" OD nylon air line for AOA through fuselage from wing root to IP. Routed "...
Monday, December 10, 2018
Avionics
›
Joystick Boots ( 2 hrs ) Per Sect 42-07, positioned joystick boot material (used mini-clamps & double sided tape), then riveted w/ AAC...
Saturday, December 8, 2018
Avionics
›
Snap Bushings for OAT cable, Pitot, & AOA lines ( 3 hrs ) Drilled 8 places with Uni-bit for SB375-4 bushings in LH seat ribs - will ro...
Friday, December 7, 2018
Avionics
›
OAT wire routed, etc ( 3 hrs ) Routed OAT (outside air temp probe) from backside of G3X Touch display (GDU460) to center tunnel. Required...
‹
›
Home
View web version