Aileron Actuation ( 4 hrs )
Used Template and Center Punch to designate 6 holes at ends of each tube. Included VA-111 Threaded Rod End in place (4x) so would be drilled simultaneously. Drilled #40 followed by #30 using clecos to hold positions. Deburred, cleaned with acetone, and primed. Taped over alignment marks to enable correct re-assembly. Plan touch up at those small areas with primer after riveting.
 |
Used rod end bearing as "handles" to install rod ends. |

 |
Ready to rivet, then touch up label zones. |