Control Sticks & Elev Pushrods ( 5 hrs )
Completed Steps 4 - 9, Sect 36-10 for Align & Drill LH & RH Control Sticks into Bases. Prepped Control Stk Bases per Steps 1 - 2, Sect 36-11. Removed all masking from Fuse for the big reveal. Looking good. Installed Fwd & Mid Elev Pushrods per Sect 36-05, -07, -08, -09 attaching to Control Column, Idler Arms between, and Bellcrank. Super smooth with zero drag and no interference. Sweet !
 |
left SS firewall unpainted |
 |
un-masked... |
 |
challenge to reach. Washer "wrenches" very helpful |