Installed the Oil Cooler Tray to the Firewall and Engine Mount following Steps 3-6 at 49-08, including adding actual Oil Cooler and Inlet Assembly. Connected hoses to Cooler per 49-13 -- but waiting delivery of 7/8" crowfoot to apply final torque. Started build of 4" SCAT duct per Sect 49-15, Steps 1 & 2. Letting hi-temp RTV cure before assembly to Cooler.
Tray bolted in place |
checking alignment of Cooler |
Tah Dah ! Sealed remaining gaps, too. |
from opposite side through maze of hoses, engine mount. Not final torqued...yet. |
good clearance around hoses...although pic doesn't show well |
4" SCAT cut to length, applied RTV along entire length for "stability" |