I've started my adventure to build a Van's Aircraft RV14a. For several years, I've been planning to build an Experimental (homebuilt) airplane - once retired.
But first, I needed to get my Pilot's License. (Kinda key !) So... first things first: I retired March 2014 from Caterpillar - and started flying lessons in the Summer of 2014. Soloed a day after Christmas, and got my Private July 2015. Shop set up, tools acquisition, and practise kits during Fall launched me into my build starting Dec 31, 2015 !

I've chosen to build the RV14a since it's about 10% larger than Van's prior models - so it fits my 6'4" frame well. Van's is well known for great value & outstanding flying qualities. It's been a no brainer decision for me. A tour of their facilities and demo flight in Oct 2013 clinched the deal. My wife - also a pilot - exclaimed after her demo flight "retire NOW so you can build one of these". The RV14a fits my mission of a good compromise between cross country & aerobatics. Plus...I fit, too.

So far, one month into building, it's been rewarding. Very challenging, but certainly a learning experience. The builder community is terrific - as is Van's tech support. I'm finished with the Vert Stab and Rudder (Jan 2016). So... with a 5 month delivery lead time, I've ordered the Quick Build Wings and Fuselage.

I hope this blog assists other new builders, just like several others have been valuable to me. Plus it will serve to document my build step by step. Please drop me a line via the "contact me" form on lower RH margin.
Update: April 2020 relocated to Wickenburg, Az to escape Illinois winters.

Tuesday, August 14, 2018

Finish Kit

Intersection Fairings ( 3 hrs )

Steps 4-8 at Sect 46A-23 completed for Upper Intersection Fairings:    added epoxy resin/flox mix in 1.6 mm layer.  First coated Fuselage contact area with wax to avoid gluing permanently !  Then repeated for Lower Fairings per Steps 1-3 at 46A-24.   Extra flox at screw locations so feasible to machine c'sink later.   Wheel Fairing surface coated with wax  - hope they come off after curing !
finger painted with wax 1st

loaded with flox, ready to raise into position. 
(Tape prevents flox from gluing aft end together)

Screws hold position until flox cures.   Some of the holes were
elongated when drilled (searching for center of nutplates)  Vans
anticipated with note in instructions...now odd shaped holes fill
in with flox, 

Lower Intersection Fairing with flox applied...