Alt Air Inlet and Oil Cooler Tray ( 3 hrs )
Match drilled six #40 holes, dimpled the 2 forward locations, then riveted Right Air Ramp Cone per Steps 10-14, Sect 47-21. Next, installed nutplate for Air Filter Cover per Steps 9-14, Sect 47-22. Done with Snorkel, except left plastic tape over inlet at Fuel Servo for now, w/ note hanging below as reminder to remove. Started building Oil Cooler Tray per Sect 49-06, Steps 2-7 by deburring holes and edges.
 |
perfect fit of Cover retaining K&N Air Filter. |
 |
not shown, also cut 4 tubes to 3.5" for spacers |