Alternator ( 3 hrs )
Installed Alternator per Sect 43-12 Steps 1-6 (ref prep in March 17 log). Per instructions, delayed setting belt tension until Sect 51-06, after propeller installed, etc. Safety wire took a trial run, but getting closer to "fun". Also getting better at installing adel (or cushion) clamps using temporary safety wire, and "
Cushioned Clamp Installation Pliers". Thanks Vans Tech Support for recommending applying silicone spray to enable sliding clamps into position during assembly.
 |
routed alternator power wire along side of engine case |
 |
double clamp on mount tube routes wire to firewall |