Completed riveting Close Out panel on Canopy Frame, Steps 6-10, Sect 38-17. Maintained 0.0 degree Twist ..whew ! At Sect 38-18, assembled LH and RH Rail Assemblies and Shim onto Canopy Frame, adding aft fixture. Riveted most before needing to call it a good day (variety of sizes and reach/clearance meant some trial and error to determine best tool, technique, etc. Patience paid off with good results)
![]() |
since original grip was splitting, used tennis racquet grip wrap on rivet gun. Sweet ! |
