Installed LH Flap to confirm fit & operation, then returned to safety of "storage" room. Aligns with Aileron well.

RH tank leak test completed -- no bubbles found and balloon stays inflated at least 24 hrs. Yay ! Rec'd from Vans the 4 AN3-13A bolts (error to not include in QB kit), so I replaced the temporary -12A bolts.
Completed Electric Aileron Trim build, Sect OP 38-04, 05 and 06. Drilled, deburred, dimpled, primed and attached nutplates. Took several pics inside wing to confirm clearances and setup. Some with endoscope (lower resolution).


Crimped Molex Micro-fit Pins onto 5 wires, then inserted into Molex connector. Really challenging since tiny pins. Test fit into mating connector inside access bay. A little stiff first, then seemed easy to re-insert. Discovered one of the female pins was driven out of connector. Needs to be replaced...next work session. Fortunately I'd ordered spare pins. [ done 1/16 ]