Cowl Baffles ( 3 hrs )
Cut 6 lengths of 1" dia. PVC pipe to exactly 2.125" per "Simulating the Propeller for Fitting the Cowl" (re: Vans website at Construction FAQs). Attached Spinner Backplate with 6 std hardware 1/2-20 x 3" bolts. Ready to start fitting Cowl in place per Sect 45 in Finish Kit. Decided instead to do Sect 47 Cowl Baffles - seemed ready to do more deburring and riveting. Completed Sect 47-02, Steps 1-8 Cylinder Baffles with addition of doublers.
 |
spacers at 2 1/8" simulate actual CS Prop Hub |
 |
first parts of Cowl Baffle riveted... |