Completion of Alt Air Inlet/Door, and Air Ramps ( 4 hrs )
Completed Alt Air Inlet and Door per Steps 7-16, Sect 47-20. Epoxy/flox set up well. Seems unnecessary to also rivet, but really secure now. Installed onto Engine, then proceeded to Steps 1-10 at Sect 47-21 bending Right Air Ramp Cone, and Steps 1-8, 47-22 for Air Filter Cover w/ integral Air Ramp Cone. Instructions and templates made these steps easy. I substituted double sided tape for the spray on adhesive.
 |
"tah dah ! " |
 |
Right Air Ramp Cone fits well. |
 |
2/3 done step forming Cover Air Ramp |
 |
Pleased with fit. |