Canopy Frame Assembly ( 3 hrs )
Finished Steps 17 & 18 at Sect 38-16 for 3rd Support Frame at Splice and Intercostals. Then at Sect 38-17 Steps 1-5 final drilled as specified followed by riveting Close Out panel ( pattern helps minimize chance of twist). Checking frequently with level accurate to 0.1 degrees since NO TWIST is critical -- pleased LH vs RH side is staying matched at 7.6 degrees (ie 0.0 degrees delta !).
 |
first sequence...center out to hinges |
 |
Next seqence required using wedge since tight spacing to hinge |
 |
forward Support Frame riveted. |