Intersection Fairings ( 4 hrs )
Removed all 4 Intersection Fairings ( yep, they didn't stick permanently! ). Ground off excess flox per Steps 6 at 46A-24. Completed Steps 1-4 at 46A-25 building lugs with resin/flox on Upper Fairing encapsulating MS21042-06 Nuts that will serve to keep aft ends tight.
 |
green is the turtle wax transferred to resin/flox.
Perfect contact with Wheel Fairing |
 |
after grinding excess flox. |
 |
geesh...more fiberglass dust ! |
 |
ready to embed nut |
 |
thick resin/flox starting to cure |
 |
hoping sufficient wax on threads so I can remove screw ! |