Cut out and smoothed Gear Leg Openings in bottom of Fuselage: Step 3, 7-9 at Sec 26-10 for Tri Gear builder. Nancy helped rotate the Fuselage onto a side so this was much easier ! Took some time since I first rough cut opening, leaving material to hand file down to final size (aligned with inside panel already open - serves as template)

11/16" hole is for brake line routing along
gear leg