Per 46A-14, Steps 1-7 - final drilled #27 holes in forward shell attach holes. Riveted 8 nutplates onto aft shell. Fit piece of fiberglass scrap to top center of aft shell. Bonded on with epoxy instead of two rivets per Vans instructions.
![]() |
"scrap" piece from forward shell bonded to complete the opening for the Gear Leg. (white paper was the template created) |