Finished 1/8" drilling on canopy Close Out Panel. Started Sect 38-11. Separated RH & LH Canopy Rail Angles via bandsaw, then ground edges smooth. Fluted (heaviest pieces fluted so far !) LH side. Stopped to go enjoy a beautiful afternoon with mild weather suitable for long ride on my Harley.
done drilling 1/8" (copper clecos) and 3/32" holes (silver clecos). |
LH fluted, cleco'd to rail. RH not done yet. |