Spinner mounting ( 3 hrs )
Added remaining nutplates to Spinner Plate. Checked fit of Gap Fillers and Spinner to Prop Blades as angled from min to max pitch per Step 6, Sect 44-07. (per instructions, clamped 30" boards to blade about 10" from end for leverage). Trimmed small amount fiberglass to meet 1/8" clearance. Torqued and safety wired 4 bolts holding Front Bulkhead. Started Step 7 to rivet Gap Fillers to Spinner Plate - but determined I will need to loosen 4 bolts holding Plate to Hub to gain tool clearance. At first it seemed I could rivet with Plate still in place, but 2 rivets are too close to blades for either "Main Squeeze", or rivet gun/bucking bar. Drat... Received shipment from Vans with my Landing Lights and Wing Tip Nav/Strobe Lights. These are Aero LEDs recommended by Vans.
|
Front Bulkhead for Spinner |
|
All 22 nutplates and Screws installed. Final clearance at Prop |
|
Landing Light Kits...brackets, hardware |
|
Nav /Strobe Lights for Wing Tips |