Nancy (aka Rosie the Riveter) helped rivet per Steps 1-5 at Sect 30-07 for Aft Fuse Top Side Rivets. While I bucked, she took over the rivet gun. Most of the time, we were using step stools to enable access - some are quite a reach (around back of bulkheads especially). The Shoulder Harness Lug is now secured, and the Longerons joining Aft to Forward also.
These were challenging to reach behind bulkhead toward top of fuselage. |
The top rivets are done. Next lower sides and underneath per Sect 30-08.