Vertical Stab (2hrs)
Sec 6-5 Step 3. Almost done with Vert Stab assembly (at least this section of manual).
Key is following sequence along front spar from "center" to tip, then center back to root. I was concerned with reaching these and "blind" bucking, but went better than expected. Checking shop ends by pressing finger onto head, then measuring depression on finger. While fingers get sore after awhile, sure feels good to get this part done.
Pics below show finished Vertical Stab...at least completed Section 6. Hooray...!
Great idea to tape over holes to leave unfilled. Easy to get confused as focused on riveting. |
Above pics show after completing Step 4 - rivet along top and bottom, and along rear spar. Required mostly Main Squeeze, but several required rivet gun and bucking bar due to limited access. 470 heads in spar next to skin rivets often prevented using squeezer. Some I could do after switching sets, changing spacing, etc. This last step took a little longer than expected, but looks great when done.
No comments:
Post a Comment