Vertical Stab (3.5 hrs )
Sec 6-4 Step 6 Rivet Rear spar & hinges. Great to see parts coming together. Lots of different length and style rivets, but instructions are clear. Surprised how much "grunt" takes to use Main Squeeze on the 1/8 inch rivets. Lots of rivets, so got good exercise in arms.
Applying primer only to surfaces "scratched" during processing. Trying to avoid excessive weight. Some areas only receive light coat if Alclad is not been scratched.
Hole left open for Sec 10-05, 10-28, & 11-07. |
Tape over some holes is temporary - until assembly with skin. |
Sec 6-5 Step 1. Assembled Front Spar. (no pics) This simple step is challenging due to access to the rivets at angled flanges. Worked through different set ups for each "joint" to enable proper access.
No comments:
Post a Comment