Aft Fuselage (2.5 hrs )
Determined needed about 4" more of C1037 and C1036 wires toward front...so entire W00057 Aft Fuse Harness had to have tie wraps removed, re-adjusted position about 5 inches, and re-installed. Sect 10-25 doesn't provide length of C409P connector/hharness portion at rear. But while working on Aft Deck installation, determined I had excess length at rear (Sect 10-27 Fig 3). Other antenna and harness directions clearly show critical length of free ends on installation pages. So would've been helpful on 10-25 ! Required about 1 hr to re-do.
|
C1036 & 37 were 4 inches short of bulkhead |
|
Corrected...taped to front of bulkhead |
Sect 10-27 cont'd with dimpling and fit up of Aft Deck pieces. Discovered missed dimpling across top of F0140C bulkhead - but fortunately easily done w/ Main Squeezer (whew). Re-primed the 8 holes. Cleco'd and Final Drilled all holes. I'll prime after Match Drilling the 2 angle reinforcements.
|
fit is good ! |
|
ready to match drill 2 angles |
No comments:
Post a Comment