Happy New Year ! One year since started actual building...and come a long way, with a LOT yet to do... Started Section - page 23-04: Bellcrank to Aileron Pushrods by cutting one 48" steel tube to 21.375" lengths. Lots of drilling using drill press - first #40 holes, then inserted male rod ends to match drill #30 holes. Needed to use drill press with file to "turn" down rod end in order to fit into tubes...still tight, but used rod end bearing screwed on as "handle". Deburred and ready to clean so I can prime inside of tubes before riveting. Think I'm going to use shotgun cleaning rod to reach all the way.


No comments:
Post a Comment