Canopy Assembly ( 3 hrs )
Completed Steps 10 to 16 at Sect 38-16: Machine C'sunk Rail Base, then cleco'd on Canopy Frame Close Out panel. This really stiffened entire assembly due to box structure. Re-installed the 2 fixtures and determined perfect spacing - no forcing/flexing/adjusting needed. Blind riveted two Splices, then riveted 3rd Frame Flange. Opened Propeller packaging and confirmed in excellent condition - impressive as each end is encased in foam.
|
prior to adding Close Out panel |
|
Close out panel added |
|
1 of 2 Splices riveted |
|
fixtures re-installed, then flipped over for pic |
No comments:
Post a Comment