Completed riveting Close Out panel on Canopy Frame, Steps 6-10, Sect 38-17. Maintained 0.0 degree Twist ..whew ! At Sect 38-18, assembled LH and RH Rail Assemblies and Shim onto Canopy Frame, adding aft fixture. Riveted most before needing to call it a good day (variety of sizes and reach/clearance meant some trial and error to determine best tool, technique, etc. Patience paid off with good results)
since original grip was splitting, used tennis racquet grip wrap on rivet gun. Sweet ! |
No comments:
Post a Comment