Completed Steps 4-8, Sect 38-14 building Aft Canopy Frame Ass'ly. Match drilled, deburred, Primed frames, then riveted Handle Ass'ly. The C-01442C Aft Canopy Fixture is key to insuring alignment. Pleased with perfectly flat when done, and fits Retention Pins on Roll Bar.
after match drilling |
fixture holds alignment |
trial fit aligned with Roll Bar and Retention Pins (prior match drilling) |
after this pic, again checked alignment with Roll Bar
and Retention Pins...seems A-OK !
|
No comments:
Post a Comment