Cont'd assembly of Wheel Fairings per Sect 46A-03 Steps 1-5 for RH side. Will repeat for LH side before continuing with remaining steps. Received from Stein Air the crate with all instrumentation and Panel. Really well packed. Looks great ! Yay....Christmas in July!
Add caption |
No comments:
Post a Comment