Completed installation of P-Lead and gnd wire to LH Mag. Connected Oil Temp sensor and bundled wires w/ P-Lead. Soldered Fuel Press and Oil Press sensors at LH firewall, leaving extra lengths (just in case require re-do, etc). Wrapped engine mount tube with silicone tape for protection, then cable tied "loops" of sensor wires to tube.
![]() |
top view showing wire routing to LH Mag & Oil temp sensor |
![]() |
Add caption |
![]() |
first pressure sensor wiring soldered connections with 2 layers heat shrink tubing |
![]() |
both press sensors connected. |
![]() |
silicone tape over engine mount tube, then cable tied "loops" of wiring |
![]() |
nested wiring and secured with cable ties |

No comments:
Post a Comment