Another beautiful Spring day - Sunny, 70 degrees, and only 4 mph winds....so went flying instead of building today. Plus mowed yard, played tennis. Thus only 1 hr in shop today. Rudder Stops in Sect 10-4 are crazy shaped pieces ! Required extra caution to insure interpret cut dimensions correctly. Note the isometric dwg above has parts "flipped" vs 2 view dwgs below. Need new 18 pitch band saw blade...so only finished RH piece.
I've started my adventure to build a Van's Aircraft RV14a. For several years, I've been planning to build an Experimental (homebuilt) airplane - once retired.
But first, I needed to get my Pilot's License. (Kinda key !) So... first things first: I retired March 2014 from Caterpillar - and started flying lessons in the Summer of 2014. Soloed a day after Christmas, and got my Private July 2015. Shop set up, tools acquisition, and practise kits during Fall launched me into my build starting Dec 31, 2015 !
I've chosen to build the RV14a since it's about 10% larger than Van's prior models - so it fits my 6'4" frame well. Van's is well known for great value & outstanding flying qualities. It's been a no brainer decision for me. A tour of their facilities and demo flight in Oct 2013 clinched the deal. My wife - also a pilot - exclaimed after her demo flight "retire NOW so you can build one of these". The RV14a fits my mission of a good compromise between cross country & aerobatics. Plus...I fit, too.
So far, one month into building, it's been rewarding. Very challenging, but certainly a learning experience. The builder community is terrific - as is Van's tech support. I'm finished with the Vert Stab and Rudder (Jan 2016). So... with a 5 month delivery lead time, I've ordered the Quick Build Wings and Fuselage.
I hope this blog assists other new builders, just like several others have been valuable to me. Plus it will serve to document my build step by step. Please drop me a line via the "contact me" form on lower RH margin.
Update: April 2020 relocated to Wickenburg, Az to escape Illinois winters.
Thursday, May 19, 2016
Empennage
Aft Fuselage ( 1 hr )
Another beautiful Spring day - Sunny, 70 degrees, and only 4 mph winds....so went flying instead of building today. Plus mowed yard, played tennis. Thus only 1 hr in shop today. Rudder Stops in Sect 10-4 are crazy shaped pieces ! Required extra caution to insure interpret cut dimensions correctly. Note the isometric dwg above has parts "flipped" vs 2 view dwgs below. Need new 18 pitch band saw blade...so only finished RH piece.
Another beautiful Spring day - Sunny, 70 degrees, and only 4 mph winds....so went flying instead of building today. Plus mowed yard, played tennis. Thus only 1 hr in shop today. Rudder Stops in Sect 10-4 are crazy shaped pieces ! Required extra caution to insure interpret cut dimensions correctly. Note the isometric dwg above has parts "flipped" vs 2 view dwgs below. Need new 18 pitch band saw blade...so only finished RH piece.
Wednesday, May 18, 2016
Empennage
Aft Fuselage ( 2.5 hrs )
Sect 10-3 Finished deburring J-Stiffeners. "Whacked" Horiz Stab Bars into flatness per Van's instructions. Kinda tedious, but got them flat. Then....deburred more edges.
Sect 10-4: Measured really carefully - then used band saw & 3M Scotchbrite wheel to create Horizontal Stab Attachment Bar Support Angle (ie HSABSA !) which is a long name for a 6" long angle. Came out great....
Sect 10-3 Finished deburring J-Stiffeners. "Whacked" Horiz Stab Bars into flatness per Van's instructions. Kinda tedious, but got them flat. Then....deburred more edges.
Sect 10-4: Measured really carefully - then used band saw & 3M Scotchbrite wheel to create Horizontal Stab Attachment Bar Support Angle (ie HSABSA !) which is a long name for a 6" long angle. Came out great....
Tuesday, May 17, 2016
Empennage
Aft Fuselage (3 hrs )
Sect 10-2 at Steps 2-6: separating J-Stiffeners, Battery Angles, etc. Lots of edge deburring... Then Sect 10-3 at Steps 1-3: repeat for more J-Stiffeners, Longerons, Bulkhead Doublers. Those Longerons are relatively thick, so edge deburring takes more time...and of course they're LONG, too.
No pics...nothing special yet.
Sect 10-2 at Steps 2-6: separating J-Stiffeners, Battery Angles, etc. Lots of edge deburring... Then Sect 10-3 at Steps 1-3: repeat for more J-Stiffeners, Longerons, Bulkhead Doublers. Those Longerons are relatively thick, so edge deburring takes more time...and of course they're LONG, too.
No pics...nothing special yet.
Empennage
Elevator (1.5 hr )
Elevators are done ! (at least all of Sect 9 build) Finished today the Molex connectors (geesh, these are tiny) for the Trim Servo. Installed into Elevator following Steps 1-5 in Sect 9-25. Powered up via 9 volt battery - to the white leads. Reverse is simple switching - and + from battery.
Elevators are done ! (at least all of Sect 9 build) Finished today the Molex connectors (geesh, these are tiny) for the Trim Servo. Installed into Elevator following Steps 1-5 in Sect 9-25. Powered up via 9 volt battery - to the white leads. Reverse is simple switching - and + from battery.
![]() |
| didn't bother to switch ends for LH and RH for picture |
Monday, May 16, 2016
Aft Fuselage
Aft Fuselage ( 1 hr )
Started Aft Fuselage, Sect 10-02. Reviewed instructions, highlighting Do Not ____'s ...and other noteworthy portions ! Gathered pieces to separate, etc. Step 1 completed separating 2 plastic pieces into 8 short segments as Cable Guides. Awkward dimensioning of dwg....vs other engrg dwg's that I'm used to, but I made it work anyway.
Build time today cut short - I visited friend, Terry Moushon, and his new RV10 to return his "RV10 bucking bar" used on my elevator. He's just completed 4th one hour flight in his test program. Terrific plane.
Started Aft Fuselage, Sect 10-02. Reviewed instructions, highlighting Do Not ____'s ...and other noteworthy portions ! Gathered pieces to separate, etc. Step 1 completed separating 2 plastic pieces into 8 short segments as Cable Guides. Awkward dimensioning of dwg....vs other engrg dwg's that I'm used to, but I made it work anyway.
Build time today cut short - I visited friend, Terry Moushon, and his new RV10 to return his "RV10 bucking bar" used on my elevator. He's just completed 4th one hour flight in his test program. Terrific plane.
Empennage
Elevator (1 hr )
Counterweights installed (2 in LH, 2 in RH). Torqued to 42 in-lbs (28 spec + 14 for friction of lock nut per Sect 5-20). Installed Trim Tab, secured hinge pin w/ .032" safety wire ( I may redo w/ .041" safety wire...tbd)

Counterweights installed (2 in LH, 2 in RH). Torqued to 42 in-lbs (28 spec + 14 for friction of lock nut per Sect 5-20). Installed Trim Tab, secured hinge pin w/ .032" safety wire ( I may redo w/ .041" safety wire...tbd)

Sunday, May 15, 2016
Empennage
Elevator ( 2 hrs)
My brother and his wife visited this week from California...so no building Tues - Sat. But lots of fun, including taking him flying for my first time.
Now on Sunday, back to building: Rolled RH Elevator leading edges top and bottom skins. Cleco'd, and ready to blind rivet. Double checked top skin overlapped bottom skin.
Later during evening, returned to complete with blind rivets. Looking good !
My brother and his wife visited this week from California...so no building Tues - Sat. But lots of fun, including taking him flying for my first time.
Now on Sunday, back to building: Rolled RH Elevator leading edges top and bottom skins. Cleco'd, and ready to blind rivet. Double checked top skin overlapped bottom skin.
![]() |
| broomstick used has convenient "nut" on end...easy to turn with wrench. |
Subscribe to:
Posts (Atom)








