I've started my adventure to build a Van's Aircraft RV14a. For several years, I've been planning to build an Experimental (homebuilt) airplane - once retired.
But first, I needed to get my Pilot's License. (Kinda key !) So... first things first: I retired March 2014 from Caterpillar - and started flying lessons in the Summer of 2014. Soloed a day after Christmas, and got my Private July 2015. Shop set up, tools acquisition, and practise kits during Fall launched me into my build starting Dec 31, 2015 !

I've chosen to build the RV14a since it's about 10% larger than Van's prior models - so it fits my 6'4" frame well. Van's is well known for great value & outstanding flying qualities. It's been a no brainer decision for me. A tour of their facilities and demo flight in Oct 2013 clinched the deal. My wife - also a pilot - exclaimed after her demo flight "retire NOW so you can build one of these". The RV14a fits my mission of a good compromise between cross country & aerobatics. Plus...I fit, too.

So far, one month into building, it's been rewarding. Very challenging, but certainly a learning experience. The builder community is terrific - as is Van's tech support. I'm finished with the Vert Stab and Rudder (Jan 2016). So... with a 5 month delivery lead time, I've ordered the Quick Build Wings and Fuselage.

I hope this blog assists other new builders, just like several others have been valuable to me. Plus it will serve to document my build step by step. Please drop me a line via the "contact me" form on lower RH margin.
Update: April 2020 relocated to Wickenburg, Az to escape Illinois winters.

Friday, June 23, 2017

Fuselage

Brake Lines ( 3 hrs )

Installed Brake Lines - Crossover and Main Brake Lines per Sect 33-08 & -09/.  Prepped Cable Links for priming per Sect 33-12.  Installed nylon Cable Guides.



Thursday, June 22, 2017

Fuselage

Rudder Pedal Assembly ( 4 hrs )

Installed 8 Brass Elbows to Brake Master Cylinders on Rudder Pedal Ass'ly ( Sect 33-04).   Installed first set of Brake Lines between Reservoir to Slave fittings.  Pic shows instructions in Sect 5.22 to drill end of tubing and press in a brass insert --that's a first for me.    Installed entire assembly into Fuselage per Sect 33-05 & -06.   Pedals swing freely w/ light effort - super smooth.    Ka-Ching !
 

Wednesday, June 21, 2017

Fuselage

Control Sticks & Elev Pushrods ( 5 hrs )

Completed Steps 4 - 9,  Sect 36-10 for Align & Drill LH & RH Control Sticks into Bases.  Prepped Control Stk Bases per Steps 1 - 2, Sect 36-11.  Removed all masking from Fuse for the big reveal.  Looking good.  Installed Fwd & Mid Elev Pushrods per Sect 36-05, -07, -08, -09 attaching to Control Column, Idler Arms between, and Bellcrank.   Super smooth with zero drag and no interference.   Sweet !
left SS firewall unpainted
un-masked...



challenge to reach.
Washer "wrenches" very helpful




Tuesday, June 20, 2017

Fuselage

Bellcrank Assembly ( 4 hrs )

Built Bellcrank Mount and AutoPilot Pitch Servo Bracket per Sect  36-06 and -07.  1st trimmed bracket, added optional 1.25" dia lightening hole.  Deburred holes & edges on both.  Machine C'sunk Mount for flush rivets holding 8 nutplates.  Primed both.   Riveted K1000 nutplates using my "Main Squeeze" - sure works great.  Although time to install Pushrods, decided to wait another day for paint curing before I remove masking  on Fuse interior (after touch ups yesterday).   Jumped to Sect 36-10 to assemble Control Sticks into Control Bases. These are the optional (upgrade) Sticks with Grips & wiring.  They're pre-drilled for mounting to base, which is good news.  Ready for Steps 4-8 @ Sect 36-10 (match drill and enlarge to enable bolting at joint).
 


 

Monday, June 19, 2017

Fuselage

Elevator Pushrods ( 3 hrs )

A few locations on the interior needed some re-painting.  Simply sanded with 400 grit, cleaned and sprayed a couple light coats.   These blended perfectly...so very satisfied with overall results.   Completed Elev. Bellcrank Assembly at Sect 36-06, Step 5.  Finished Fwd, Mid, and Aft Elev Pushrods by blind riveting Rod Ends, then installed Rod End Bearings / Jam nuts to specified lengths per Steps 7-9 Sect 36-03 and Steps 7-8 Sect 36-04   (Aft Elevator was to 1/32" over 6 ft length).


 Marshall County Flyers 50th Annual Father's Day breakfast / fly-in was another big success (Sunday, June 18).  Served over 1,500 people!   My wife and I worked along with 50 other volunteers from 6am to 3:30.  Lot's of work, but fun to see the enthusiasm from the community.  Lots took advantage of airplane rides for $15.

Saturday, June 17, 2017

Fuselage

Elevator Pushrods ( 3 hrs )

While waiting for interior paint to fully cure 48 hrs, prepared Fwd, Mid, and Aft Elevator Pushrods per Sect 36-03 & -04.  Used drilling template to drill holes into Rod End Fittings.  Deburred holes, scratched/buffed  with scotchbrite, cleaned all w/ acetone, then primed with Napa 7220.  Ready to rivet when primer cures.
ready to prime


Friday, June 16, 2017

Fuselage

Interior Painting ( 3 hrs )

Finally completed all masking by covering 2 air vents.  Cleaned surfaces again with acetone, then used tack rag to get remaining dust.   After one more test spray yesterday, decided to not use RustOleum Hammered Silver (inconsistency, appearance concerns).  Switched to RustOleum High Performance Enamel Spray - Aluminum #7515838 in 14oz Spray cans.  Less than $5 per can at Menards.   Glad we decided to switch - it covers really well, and provides nice satin finish.  Actually has aluminum particles as part of it's formula, too.  My work shop seemed to be A-OK as a giant paint booth using 2 fans on high out the back door of garage.  Paint looks fine with two light coats.  Applied overhead, vertical and horizontally.   Waiting 48 hrs per instructions to decide to apply 3rd coat.  Used only 2 1/2 cans so far.