I've started my adventure to build a Van's Aircraft RV14a. For several years, I've been planning to build an Experimental (homebuilt) airplane - once retired.
But first, I needed to get my Pilot's License. (Kinda key !) So... first things first: I retired March 2014 from Caterpillar - and started flying lessons in the Summer of 2014. Soloed a day after Christmas, and got my Private July 2015. Shop set up, tools acquisition, and practise kits during Fall launched me into my build starting Dec 31, 2015 !

I've chosen to build the RV14a since it's about 10% larger than Van's prior models - so it fits my 6'4" frame well. Van's is well known for great value & outstanding flying qualities. It's been a no brainer decision for me. A tour of their facilities and demo flight in Oct 2013 clinched the deal. My wife - also a pilot - exclaimed after her demo flight "retire NOW so you can build one of these". The RV14a fits my mission of a good compromise between cross country & aerobatics. Plus...I fit, too.

So far, one month into building, it's been rewarding. Very challenging, but certainly a learning experience. The builder community is terrific - as is Van's tech support. I'm finished with the Vert Stab and Rudder (Jan 2016). So... with a 5 month delivery lead time, I've ordered the Quick Build Wings and Fuselage.

I hope this blog assists other new builders, just like several others have been valuable to me. Plus it will serve to document my build step by step. Please drop me a line via the "contact me" form on lower RH margin.
Update: April 2020 relocated to Wickenburg, Az to escape Illinois winters.

Friday, September 7, 2018

Avionics

Avionics mounting ( 4 hrs )

Installed LH & RH Cabin Heat Control Cables after cutting to 36" lengths per Sect 50-07.  Needed to insure Avionics would not interfere.  Remainder spent exploring specific location & orientation on co-pilot side sub-panel.   Lots of connector and harness routing concerns to work out.  Step by step gaining clearer strategy.  Started fabrication of piano hinges to mount GTX-45R transponder.   Nick Millard at Stein Air has been helpful answering several questions.
GTX-45R: under glove box, foward to clear stuff on lower RH
instrument panel, while leaving room on left for connectors. 
GEA24 concept on sub-panel clears large connectors.
Fabricating piano hinges.

Thursday, September 6, 2018

Empennage

Empennage Fairing ( 3 hrs )

Completed filling pinholes using epoxy/micro balloons, followed by sanding.  Then re-coat with Cromax Quickprime A-4240S (purchased another 14oz spraycan at National Coating and Supplies  store).  Final wet sanded with 600 grit to prep for painting later.   So...H.Stab and V. Stab removed and back into storage.   Laid out strategy for GTX-45R Transponder mounting (on RH area under glovebox) using 2 piano hinges, etc.
Emp Fairing final sanded w/ 600 grit after filling pinholes.   Four Intersection Fairings in background rec'd same process.

Monday, September 3, 2018

Empennage

Empennage Fairing ( 2 hrs )

Finished sanding smooth where I filled pinholes.  Sprayed Cromax Quickprime A-4240S (sandable, acrylic primer) on Emp Fairing and 4 Intersection Fairings.   Looking good!  But some pinholes remain, so another round of fill, sand, prime soon.
Used most of can on canopy transition,  so ran out
 before I could fully cover both Upper Int Fairings...

Tah Dah !

Saturday, September 1, 2018

Empennage

Empennage Fairing ( 2 hrs )

Mixed epoxy/flox and filled pinholes on Emp Fairing (also some on 4 Instersection Fairings).   Later, after cured 6 hrs, sanded smooth all 4 Intersection Fairings and Empennage Fairing.    Began exploring where and how to mount various units supporting Garmin G3X system:  GTX-45 ( remote transponder w/ ADS-B in/out), GEA24 (engine monitor), GD-40 (CO detection), GPS20A (remote WAAS GPS), and GAD27 (intergrated controller).   Referenced couple other RV14 builder logs, and Layout provided by Stein Air.
flox mix added to fill pinholes ( prior sand smooth... again)
unpacking Avionics...



Empennage

Empennage Fairing ( 3 hrs )

Completed sanding high spots and contoured at HS leading edge.  Removed Fairing ( Yay !  - some prying required, but did come off...whew...) to sand edges.  Smoothed edges all around using 120 grit.  Removed excess flox underneath using dremel.  Ref Step 5 at 12-13.  Pleased with fit when re-attached.  No gaps !   Got a lot of pinholes opened via removed layer of filler/paint...so will tackle those next.
underside w/ molded flox shown
prior sanding flox on edges & contouring


re-installed after sanding edges
no gaps

Add caption


Thursday, August 30, 2018

Empennage

Empennage Fairing ( 1 hr )

Wet sanded most of Emp Fairing with 80 and 120 grit to remove waviness and high spots.   Good progress, but more needed.

Wednesday, August 29, 2018

Empennage

Empennage Fairings ( 4 hrs )

Per Sect 12-13, final trimmed Fairing edges to within 9mm of holes.  Covered Fuse, HS, and VS contact areas with cellophane packing tape (then applied auto wax for good measure).  Mixed epoxy/flox to smooth, slight sag mix then applied to underside Fairing in marked areas.   Tried not to smear all over VS as I positioned onto Fuse/HS/VS.   Inserted 27 screws followed by major clean up.  Several hours later, I began sanding to eliminate slight waviness and taper toward edge.   Lots of sanding to do next.  (I'm praying the Fairing comes off, but gonna wait until more rough sanding done)
trimmed edges, re-installed
clear tape, then car wax applied as extra release


Underside sanded where flox will be attaching
after clean up, starting to cure.  

later, after cure, began to sand.  Shows how
waviness is being eliminated.  Will have consistent
edge contacting alum, with no gaps.