In between parade and fireworks, I was able to fit in couple hours in shop. Finished Static Air Kit by installing fittings between Port and tubing (now that bonds had fully cured).
Wiring routed, Air Kit installed |
Cleaveland Static Air Kit installed. |
Then Sect 10-27: deburred three pieces for Aft Deck. Scuffed since I was already covered in dust, so I'm ready to dimple, etc next.