Pre-assembled Outboard & Inboard Straps to Fwd and Aft Rollbar Frame Assemblies per Sect 37-03 Steps 1-6. Lots of #40 size clecos. Delayed priming Straps and Window Shims until after drilling and C'sinking. Lot's of #30 drilling (every #40 hole). Not enough #30 clecos for every hole, but not required.
Outboard and Inboard Straps cleco'd to Fwd Frame |
Aft Frame cleco'd |
Window Straps cleco'd to Aft Frame |
Drilling #30 holes, replacing #40 clecos. 1/4 remain to do... |