Finished correction of Rudder Cable with installation of 8 blind rivets to retain nylon guides. A-OK now. See Aug 4 posting.
Sect 12-02 cont'd with Step 3: Fit up of Rudder Bottom Fairing requires lots of on/off cycles testing alignment and fit along edge with the Rudder - sand and file a little each time. But fit-up is now excellent. So drilled (18) #40 holes...cleco'd as I went. Ready to install nut plates after enlarge to #27.