Installed 4 nutplates and mounted GPS 20A. Removed canopy. Prepped for installing Instrument Panel next. Brother-in-law, Rex was great help moving canopy and bringing IP shipping crate up from basement. Ready for the big install !
GPS 20A installed. |
Overview...just prior to removing canopy so easier to install IP.
(also found I can reach top nutplates for GAD27 location easier,
so I should have done earlier)
|