After celebrating an early Thanksgiving with family -- back to Canopy Fairing sanding. Applied microballoon & epoxy resin into pinholes and low area using squeegee to spread thin so minimal sanding. While curing, built two extra Hinge Covers per 38-35 Steps 7- 15. Added thicker slurry resin & microballoons to fill Hinge Seal voids per 38-36, Steps 1 - 3. Installed ES00306 Micro Switch for Canopy Unlocked warning per 38-32, Step 1. Installed Rear Seal along rear edge per Step 1 at Sect 38-33.
Additional Hinge Covers. See Nov 3 posting for build process of 1st pair |