Riveted 10 nutplates to Horiz Stab and 12 nutplates to Vert Stab after match drilling #40 rivet holes, then mach c'sinking (dimpled on Horiz Stab), per Step 7 at Sect 12-11, and Steps 1-4 2 12-12. Still need 7 nutplates added to Aft Fuselage (but these were prepped during build of Aft Fuse last year).
Vert Stab nutplates added. (applied grey Napa 7720 primer at scuffed areas) |
in process of riveting nutplates to H.S. |
Able to do w/ HS still mounted to Fuselage |