Just returned from 2 wk "road trip" to Niagara Falls, Montreal, and Quebec City in Canada and Bar Harbor, Maine and Franconia, New Hampshire. Great fall colors and good time with family and friends. Now, back to building! Positioned tray for GTR 200 Radio in center stack. Drilled 6 holes for mounting to side supports. Created .038" shims to fill gaps each side and assembled with 6-32 screws. Finally, test fit both Radio and GMC 307 Auto Pilot into center stack. Tah-dah ! ...good fit.
Shims created - ready to install GTR 200 tray. |
showing position of shims. extra length helps in positioning during installation. |
G5, GMC307 autopilot, and GTR200 Radio. (allen wrench still inserted into retention mechanism) |
from overhead, between vertical supports |